To initiate a product review, complete and submit a Request for Consideration form. This must be done by materials or equipment suppliers or manufacturers. Please submit one form per request. All Request for Consideration, inquiries or questions should be addressed to the Chairperson.
The Product Review Committee will review only one application for a specific product, regardless of applicant, once within a one year time frame.
The Request for Consideration must be accompanied by an information package before the product can be brought to the Product Review Committee for consideration. The Request for Consideration must consist of three complete hard copies (more may be requested), a digital copy (PDF format as a single bookmarked file) containing the following information:
- Supplier/manufacturer's company name and address
- Applicant contact name and contact information
- Product name
- Designed or intended use for the product
- Manufacturer's brochure that provides a component-level understanding of the product
- Product standards and specifications
- Material safety data sheet, if applicable
- Listing of applicable standards and the products status with regard to approval with reference numbers (AWWA, ASTM, ANSI, NFPA, NSF and others)
- Test results showing compliance with applicable standards, including independent laboratory test results, if requested
- Information on installation, use and product specifications
- A brief history of the product manufacturer (i.e. length of time in business, market and quality objectives, etc.)
- A brief history of the product(s), (i.e. length of time in production, modifications, compatibility with other similar products, how long the manufacturer expects to continue product(s) production)
- Maintenance requirements, special equipment and procedures, recommended maintenance schedules, availability of service and training required
- A statement on the availability of the product(s) and replacement parts (i.e. supplier names and locations, size of inventory, maximum delivery time, etc.)
- Cost to supply and maintain product, if available
- Product references (municipal or public users) shall include users' name, address and telephone number, product application and number of years in use, and name and telephone number of a contact person having knowledge of the particular usage
- Explanation of how the product benefits the Division in terms of prolonged service life, reduced maintenance, reduced life-cycle cost and other relevant aspects
- Indicate if there are any special conditions (such as pipe size) for optional performance of the product. Specify conditions or requirements for optimal performance. Where appropriate, include the engineering data required for proper application of the product. Indicate relevant safety factors, and pressure, temperature or environmental limits
- Provide information related to patients, licenses, user fees and/or franchises held on the product
- Provide any other related information
Although not required, application submittal may include other data to assist the Product Review Committee in evaluating the product. This information could include brochures, videos, product samples and/or photographs. The Product Review Committee cannot be responsible for return of these materials. One copy of video and product samples is sufficient for committee review.
The applicant's Request for Consideration will be placed in queue and presented to the Product Review Committee at the earliest convenient date. The Product Review Committee's workload and the number of requests received will dictate the timeline for resolution. After a general review of applications, one of three decisions will be reach:
- The product is not warranted for further consideration as per Section: Not Warranted
- The product warrants further consideration
- The product is granted approval as per Section: Warranted
Not Warranted
The Product Review Committee may deem the product not warranted for further consideration based on the following:
- The product is not within the jurisdiction of the Product Review Committee
- The Product Review Committee fails to find a value in the product
- The product does not meet Niagara Region specifications
- The number of similar products currently listed on the list is sufficient and additional products are not needed
- Other considerations dictate that the product not be approved
The proceedings will cease and the applicant will be notified specifying the reason for refusal. If the product is not warranted, the applicant, or any other person, must wait one year from the date of decision before re-submission. The one-year waiting period is to ensure that the manufacturer adequately reviews and assesses their product for significant changes to warrant re-submission.
The Chairperson may reject from evaluation, those products with no apparent or significant application for use by the Division, or products, which are deemed not to be far enough along in the development process to be effectively evaluated.
Moratorium
Products of Equipment that are not approved may be reconsidered, if the applicant can supply additional information that may influence the stated basis for the Product Review Committee's decision. However, the Product Review Committee reserves the right to not approve any product or equipment deemed to be incompatible with our current methods and materials and to limit the number of approved manufacturers or models of any particular types of product. Ultimately, the best interests of Niagara will be paramount in its decision.
The applicant, or any other person, must wait for one year from the date of rejection before re-application. The one-year waiting period is to ensure the manufacturer adequately reviews and assesses their product for significant changes to warrant re-submission.
If the product is removed from the Approved Materials and Equipment Listing, the manufacturer and supplier must wait for two years from the date of removal before re-submission. The application for re-submission must include a written statement outlining improvements/changes made to the product and/or its supply.
Warranted
The Product Review Committee will further investigate the product as described in the in-depth review procedure.